You have a JCL job with multiple steps. The first step is to copy a dataset to another location, and the second step is to sort that dataset. What would you do if the first step fails, and you want to execute the second step only if the first step is successful?
- Set the second step as a separate job with a dependency on the first step
- Use IF/THEN statements in JCL for conditional execution
- Use the COND parameter with a condition code for the second step
- Use the NOTIFY parameter to trigger the second step upon completion of the first step
The COND parameter allows conditional execution based on the return code of the previous step. If the first step fails, the second step will not execute.
Loading...
Related Quiz
- Can you specify multiple abend code conditions for a single job step in JCL?
- When using IEBCOPY, the _______ parameter can be used to specify the name of a dataset to be copied.
- How is a symbolic parameter defined using the SET statement in JCL?
- To establish a job dependency, you can use the _______ parameter in JCL.
- Explain the role of the RESUME parameter in the IEBDG utility.