In PPP, the ________ phase is critical for negotiating options and setting up a link.
- Link Control
- Authentication
- Network Control
- Data Link
In PPP, the Link Control phase is critical for negotiating options and setting up a link between the devices.
Loading...
Related Quiz
- A company is experiencing poor audio quality in their VoIP calls during peak hours. Which QoS mechanism should be implemented to resolve this issue?
- How many bits are used in an IPv6 address, making it capable of providing a larger address space than IPv4?
- In a network with multiple switches, how does the Spanning Tree Protocol (STP) determine the root bridge?
- What is the process called when a DHCP server assigns a permanent IP address to a client?
- A network administrator needs to configure a solution for securely transmitting sensitive data over the internet to a cloud service provider. Which setup should they consider?